| Footings getting poured. |
![]() |
| Setting up forms for basement concrete walls. |
![]() |
| Concrete being poured in the wall forms. |
![]() |
| Forms are stripped and basement walls are left the cure a bit before sealing the exterior and backfilling. |
![]() |
| The hole in the wall leading from the existing basement into the addition basement. |
![]() |
| The hole in the wall leading from the existing basement into the addition basement. |
![]() |
| We are back filled...... Construction can commence. |
![]() |
| The start of the floor framing. Sill plates, some rim board, the center beam, and about half the joists cut and ready to install. |